MATLAB DISTRIBUTED COMPUTING SERVER 4 - SYSTEM ADMINISTRATORS GUIDE Manual de usuario Pagina 114

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 148
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 113
4 Admin C enter
When the tests are complete, the Running Tests dialog box automatically
closes, and Admin C enter displays the test results in the Connectivity Te sting
dialog box.
The possible test result symbols are described in the following table.
Test Result
Description
Test passed.
Test passed, extra information is available.
Test passed, but generated a warning.
Test failed.
Test was skipped, possibly because prerequisite tests did
not pass.
4-12
Vista de pagina 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 147 148

Comentarios a estos manuales

Sin comentarios